Eko Bridge History: How the 1965 Second Mainland Bridge Launched Julius Berger in Nigeria

The Second Mainland Bridge marked Julius Berger’s entry into Nigeria in 1965, was commissioned in 1968, formally opened by Yakubu Gowon in 1969, and developed in phases through 1975.

The Eko Bridge history is closely tied to the transformation of Lagos after Nigerian independence and to the beginnings of one of the country’s most prominent construction companies. Long before Julius Berger Nigeria Plc became a familiar name on major Nigerian infrastructure projects, its predecessor received a contract in 1965 to construct what was then known as the Second Mainland Bridge.

The bridge developed through several important stages. Julius Berger’s corporate history records the commissioning of the Second Mainland Bridge in 1968. Archival newsreel material records Head of State Major-General Yakubu Gowon opening Eko Bridge on 8 February 1969, while the Federal Ministry of Works states that the 1,350-metre bridge was constructed in phases between 1965 and 1975.

Together, those dates trace the development of a major engineering project that became a permanent feature of Lagos.

Eko Bridge History Begins in 1965

The story begins in 1965, when Julius Berger Tiefbau AG was awarded the contract to construct the Second Mainland Bridge. Julius Berger identifies the contract as the beginning of its operations in Nigeria.

The bridge project was financed through a soft loan from the Federal Republic of Germany, commonly known at the time as West Germany. The arrangement formed part of the economic and technical relationship between newly independent Nigeria and West Germany during the 1960s.

The Nigerian company now known as Julius Berger Nigeria Plc had not yet been incorporated when the bridge contract was awarded.

Julius Berger’s corporate records state that Julius Berger Nigeria was incorporated as a private company limited by shares on 18 February 1970, with incorporation number RC 6852. The company later became a public limited company.

EXPLORE NOW: Biographies & Cultural Icons of Nigeria

The 1965 contract therefore preceded the establishment of the Nigerian corporate entity and marked the beginning of the Julius Berger organisation’s long association with Nigeria.

The Second Mainland Bridge Becomes Eko Bridge

The project was initially known as the Second Mainland Bridge.

Julius Berger’s historical timeline records 1968 as the year of the commissioning of the Second Mainland Bridge and states that it was symbolically named Eko Bridge.

The company describes the bridge as Africa’s longest concrete bridge at the time and presents the project as an important engineering achievement in the early history of its Nigerian operations.

Another significant event followed in 1969.

Archival newsreel material records Major-General Yakubu Gowon, then Head of the Federal Military Government and Commander-in-Chief of the Armed Forces, opening Eko Bridge in Lagos on Saturday, 8 February 1969.

Gowon had become Nigeria’s military Head of State in July 1966 and remained in office until July 1975. The Eko Bridge ceremony therefore took place during the Nigerian Civil War, which lasted from 1967 to 1970.

The 1968 commissioning and the February 1969 opening ceremony represent distinct milestones in the bridge’s early history.

Why 1975 Also Appears in Eko Bridge History

Another important date associated with Eko Bridge is 1975.

The Federal Ministry of Works describes Eko Bridge as a 1,350-metre structure built in phases between 1965 and 1975. The phased development explains why 1975 also appears prominently in accounts of the bridge.

The bridge’s chronology can therefore be presented through four important milestones:

1965: Julius Berger Tiefbau AG received the Second Mainland Bridge contract.

1968: Julius Berger records the commissioning of the bridge and its symbolic naming as Eko Bridge.

8 February 1969: Major-General Yakubu Gowon opened Eko Bridge in Lagos.

1975: The phased construction period recorded by the Federal Ministry of Works reached its endpoint.

These dates reflect different stages in the creation and development of the bridge.

The Project That Established Julius Berger in Nigeria

Eko Bridge occupies a special place in Julius Berger’s corporate history because the 1965 contract marked the beginning of the company’s involvement in Nigeria.

Julius Berger Nigeria was formally incorporated in 1970, five years after the original bridge contract. The company subsequently became involved in numerous major infrastructure and industrial projects across the country.

Its corporate history records work on the damaged Niger Bridge at Onitsha in 1970, followed by further road, dam, industrial and port projects during the 1970s. Julius Berger later became heavily involved in the development of Abuja and other major Nigerian infrastructure projects.

Eko Bridge was therefore more than a transport project. It became the foundation of a construction business that would develop into one of Nigeria’s most recognisable engineering companies.

Historic Photographs of the Eko Bridge Project

Photographs from the construction era provide an important visual record of the Second Mainland Bridge project. Heavy vehicles, machinery, engineers, workers and bridge works show the physical scale of the construction programme undertaken in Lagos during the 1960s and 1970s.

Construction photographs also capture an important period in Nigeria’s post-independence development, when major infrastructure projects were reshaping Lagos and other parts of the country.

Personnel appearing in archival photographs are best described according to the information supplied by their original captions or archival records. Where individuals are unnamed, terms such as construction personnel, engineers, workers or staff at the construction site provide an appropriate description.

EXPLORE NOW: Democratic Nigeria

The images preserve details that written documents cannot always convey: the equipment in use, construction methods, working conditions and the gradual emergence of the bridge itself.

They are therefore an important part of the visual history of Eko Bridge and Julius Berger’s first Nigerian project.

Eko Bridge and Lagos Transport

Eko Bridge links Lagos Island with the mainland and became one of the major bridge connections serving the city.

The Federal Ministry of Works identifies the structure as approximately 1,350 metres long. Its development expanded the road connections between Lagos Island and the mainland during a period of major political, demographic and infrastructural change.

The bridge also forms part of the wider history of Lagos transport.

Carter Bridge had already provided an important road connection between the Island and the mainland. Decades later, the Third Mainland Bridge would become another major crossing within Lagos’s expanding transport system.

Eko Bridge became a vital part of this network, helping to carry road traffic between Lagos Island and the mainland and supporting movement through one of Nigeria’s busiest urban areas.

Its continued use also explains the substantial maintenance and rehabilitation programmes undertaken by successive governments.

More Than Half a Century of Maintenance

Eko Bridge has required repeated inspection, maintenance and rehabilitation as it has aged.

In 2020, the Federal Ministry of Works reported rehabilitation works involving bridge components and described the structure as having been constructed in phases between 1965 and 1975.

Federal attention continued in later years.

In April 2025, Works Minister David Umahi inspected underwater and structural elements of major Lagos bridges, including Eko Bridge, as part of government efforts to assess their condition and undertake necessary maintenance.

A significant incident was announced on 6 May 2026. The Federal Ministry of Works reported that illegal dredging activity around Eko Bridge had resulted in a barge striking a pile cap.

Umahi stated that several supporting piles were damaged. The incident led to plans for emergency engineering intervention, specialist underwater investigations and repair work on the affected structural elements.

Further federal intervention followed.

On 10 August 2026, repair works involving Eko Bridge and Marine Bridge were formally flagged off during a Lagos stakeholders’ engagement. President Bola Ahmed Tinubu was represented at the event by Lagos State Governor Babajide Sanwo-Olu.

The continuing repairs demonstrate the enduring importance of Eko Bridge within Lagos’s transport system more than half a century after its construction began.

Four Dates That Define Eko Bridge History

Four dates provide a clear framework for understanding the development of Eko Bridge.

The first is 1965, when Julius Berger Tiefbau AG received the Second Mainland Bridge contract and began Julius Berger’s Nigerian operations.

The second is 1968, when Julius Berger records the commissioning of the bridge and its symbolic naming as Eko Bridge.

The third is 8 February 1969, when Major-General Yakubu Gowon opened Eko Bridge in Lagos.

The fourth is 1975, the final year in the Federal Ministry of Works’ recorded period of phased construction from 1965 to 1975.

Together, these milestones document the progression of the project from contract award through commissioning, ceremonial opening and subsequent construction phases.

EXPLORE: Nigerian Civil War

Conclusion

The Eko Bridge history begins with Julius Berger Tiefbau AG’s 1965 contract for the Second Mainland Bridge, the project that established Julius Berger’s presence in Nigeria.

Julius Berger records the bridge’s commissioning and symbolic naming as Eko Bridge in 1968. Major-General Yakubu Gowon opened Eko Bridge on 8 February 1969, while Federal Ministry of Works documentation describes the 1,350-metre structure as having been built in phases between 1965 and 1975.

The bridge subsequently became an enduring part of Lagos’s transport network, while Julius Berger developed from its first Nigerian contract into one of the country’s best-known construction companies.

More than six decades after the original contract was awarded, Eko Bridge remains a working piece of Lagos infrastructure and a physical reminder of a formative period in Nigeria’s post-independence engineering history.

Author’s Note

Eko Bridge illustrates how major infrastructure projects become part of national history through a succession of milestones. The 1965 contract introduced Julius Berger to Nigeria, the 1968 commissioning established Eko Bridge as a landmark project, Yakubu Gowon’s 1969 opening placed it within the public life of the nation, and construction phases continued through 1975. More than half a century later, the bridge remains in use, linking the ambitions of post-independence Nigeria with the continuing responsibility to maintain the infrastructure inherited by later generations.

References

Julius Berger Nigeria Plc. Profile & History. Corporate historical record covering the 1965 Second Mainland Bridge contract, financing through a Federal Republic of Germany soft loan, the 1968 commissioning of Eko Bridge and the incorporation of Julius Berger Nigeria in 1970.

Julius Berger Nigeria Plc. Consolidated Unaudited Financial Statements, First Quarter 2026. Corporate filing recording incorporation of Julius Berger Nigeria on 18 February 1970, with incorporation number RC 6852.

Federal Ministry of Works and Housing, Nigeria. Marine Bridges in Lagos, 18 October 2020. Records Eko Bridge as a 1,350-metre structure built in phases between 1965 and 1975 and details federal rehabilitation works.

Reuters News Archive. Archival newsreel material recording Major-General Yakubu Gowon opening Eko Bridge in Lagos on 8 February 1969.

Federal Ministry of Works, Nigeria. April 2025 report on inspections of underwater and structural elements of major Lagos bridges, including Eko Bridge.

Federal Ministry of Works, Nigeria. Statement of 6 May 2026 concerning structural damage to Eko Bridge following dredging activity and a barge collision with a pile cap.

Radio Nigeria Lagos. Report of 10 August 2026 on the flag-off of repair works on Eko Bridge and Marine Bridge.