Lagos-Kano Railway: Colonial Legacy to Modern Times

The Lagos–Kano Railway, historically built in stages under British colonial administration, remains one of Nigeria’s most consequential transport corridors. Designed to move goods efficiently from the interior to the coast, it connected Lagos to Kano through major cultural and economic regions. Over the decades, the line has witnessed decline, neglect, and partial rehabilitation, reflecting broader trends in governance, policy, and infrastructure priorities. Understanding its evolution provides insights into Nigeria’s political economy, infrastructure challenges, and the continuing strategic value of rail.

Origins: Colonial Construction and Purpose

Colonial rail construction in Nigeria began in the late 1890s. The Lagos–Ibadan line was constructed between 1898 and 1901, marking the first major railway project in the colony. Soon after, the northern Baro–Kano works were built between approximately 1907 and 1911. By 1912, these southern and northern lines were amalgamated into a single Government Department of Railways, laying the foundation for what would later become the Nigerian Railway Corporation (NRC).

The British designed these railways primarily to transport agricultural produce—groundnuts, cotton, hides, and timber, from interior regions to coastal ports. The line also reinforced political control, facilitated administration in the hinterland, and integrated regional markets. Tracks were laid in the Cape gauge (1,067 mm / 3 ft 6 in), standard across British African colonies.

Expansion and the Interwar Network

The railway network extended gradually northwards. By the 1920s, the Lagos–Kano route linked Lagos, Ibadan, Ilorin, Jebba, Minna, Kaduna, and eventually Kano. Later extensions connected eastern and northeastern routes, including Maiduguri. These lines became critical for both freight and passenger transport, stimulating urban growth at stations and junctions and fostering regional economic hubs.

Post-Independence Decline: Multiple Causes

After Nigeria gained independence in 1960, the railway remained central to national logistics. However, by the 1970s–1990s, the system faced steep decline. This fall was multi-causal, not solely due to military governments:

  • Competing investment in road infrastructure
  • Oil revenue dominance diverting funds away from rail
  • Chronic underfunding of maintenance
  • Vandalism, theft of rail components, and neglect
  • Institutional weaknesses and inconsistent policy continuity

Military regimes, frequent coups, and governance instability contributed to irregular maintenance and underinvestment, but infrastructure decay also reflected structural and financial constraints over decades. Passenger travel and freight volumes dropped sharply, and the once-extensive rolling stock and track systems deteriorated.

Rehabilitation and Modernisation

From the early 2000s, both civilian and technocratic administrations prioritised rail rehabilitation. Efforts have included:

  1. Rehabilitating existing narrow-gauge (Cape gauge) corridors
  2. Constructing new standard-gauge lines

Significant milestones include:

  • Lagos–Ibadan standard-gauge line opened in 2021
  • Abuja–Kaduna standard-gauge line opened in 2016
  • Planned Lagos–Kano standard-gauge corridor, projected at ~1,343 km, with ongoing feasibility and construction phases

Freight Relaunch: June 2024

On 6 June 2024, a trial freight service resumed on the rehabilitated Lagos–Kano narrow-gauge corridor. Forty-foot containers moved from Apapa Port, Lagos to Dala Inland Dry Port, Kano, signalling both commercial potential and the practicality of using existing narrow-gauge tracks while standard-gauge planning continues. The Ministry of Transportation highlighted this as a key step in restoring Nigeria’s freight rail capability.

Impact of Military Era and Coups

The railway’s decline in the latter half of the 20th century coincided with multiple military regimes (1966–1979; 1983–1999). While military governments sometimes initiated large infrastructure programmes, budgetary prioritisation often favoured roads, urban projects, and security over rail maintenance. Coups and unstable governance disrupted policy continuity, delaying or abandoning projects. Civil war (1967–1970) damaged key lines, and post-war reconstruction faced chronic resource gaps.

Governance issues weak oversight, corruption, and centralised decision-making, further exacerbated maintenance backlogs and regional inequities. Modern revival efforts are designed to overcome these historical challenges.

Why the Lagos–Kano Railway Still Matters Today

The corridor retains strategic importance:

  • Economic integration: Efficient movement of agricultural goods, raw materials, and containers between northern and southern markets reduces road congestion and transport costs.
  • National cohesion: Linking diverse regions symbolises national unity and supports inter-regional trade and cultural exchange.
  • Infrastructure planning: Modern standard-gauge lines and upgraded facilities enable freight, logistics, and potential passenger services to expand, reducing dependence on road transport.
  • Employment and urbanisation: Railway hubs stimulate local economies, supporting jobs in logistics, dry ports, and associated services.

Reviving the railway demonstrates both practical economic benefits and the long-term value of planning and maintaining key national infrastructure.

Challenges Ahead

Despite progress, challenges remain:

  • Funding gaps: Large-scale rehabilitation and standard-gauge projects remain capital-intensive
  • Gauge compatibility: Narrow-gauge corridors have speed and capacity limitations; standard gauge is superior but costlier
  • Vandalism and security: Theft and damage of rail assets continue to threaten operations
  • Policy continuity: Success depends on coherent, long-term oversight beyond political cycles

The Lagos–Kano Railway exemplifies colonial engineering, post-independence neglect, and modern rehabilitation efforts. Initially built for British export priorities, it has endured decades of decline and underfunding, reflecting Nigeria’s broader governance and policy challenges. The 2024 freight trial and ongoing standard-gauge projects mark a turning point: the line is not only a relic of the past but a foundation for a more integrated, safer, and efficient national transport network. Its revival is both an economic imperative and a symbol of enduring national connectivity.

Author’s Note

The Lagos–Kano Railway illustrates the intersection of colonial legacies, post-independence policy, military governance, and modern infrastructure planning. Its history reveals the complex dynamics of investment, neglect, and revival, providing lessons for future national development and inter-regional integration.

References

  1. Nigerian Railway Corporation — official history:
  2. “Freight services resume on Lagos–Kano narrow gauge railway,” Nairametrics, 6 June 2024: Nairametrics
  3. The Nation Newspaper, “Reviving the comatose railways”
  4. RFI (Radio France Internationale), “Lagos-Kano rail link keeps death off the roads”

Read More

Recent